Goal – install 8s SDFlex in new 1075 G2 HPE rack (P/N: P9K05A)
Step 1) move vertical pillars for 9 (nine) holes
before
after…
Comment: after vertical pillars moving no space for big vertical-mounted PDU left ⇒ use zero-mount PDU
Step 2) mount SDFlex (nothing special)
Step 3) cable SDFlex modules according to the map (you should have a map)
Comment: use appropriate cable lengths for airflow and beauty.
Step 4) install face front air door for beauty and correct air flow
Step 5) install the rest IT components in the rack if needs (example with DL180 Gen9 for OneView management)